Thanks to Jesse, VE7LYD, the 1050 node has been successfully re-built with an almost brand new machine. Also, the 146.900 repeater has been linked back into the SIRG network on a temporary basis via a crossband repeater.
Thanks to Jesse, VE7LYD, the 1050 node has been successfully re-built with an almost brand new machine. Also, the 146.900 repeater has been linked back into the SIRG network on a temporary basis via a crossband repeater.